DDG – I USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23
S. NO. | GOALS | TARGET Q1 | TARGET Q2 | TARGET Q3 | TARGET Q4 | REMARKS | ||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. | Scheme for provisioning of mobile services in uncovered villages of Rest of NER | |||||||||||||||||||||||||||||||||||||
1.1 | Progress of verification of sites by testing agency (cumulative) | 130 (10%) | 325 (25%) | 650 (50%) | 975 (75%) | As on 15.10.2022, 590 sites have been verified. However, verification report is yet to be submitted by testing agency. | ||||||||||||||||||||||||||||||||
1.2 | Quarterly verification of downtime of the commissioned sites through LSAs | Ongoing activity | Around 70 % verification of 21-22 is finished. Balanced work is under progress. | |||||||||||||||||||||||||||||||||||
2.1 | Rollout of 1 lakh FTTH connections under pilot through BSNL | Scheme approved | 40,000 FTTH connections | 60,000 FTTH connections | ||||||||||||||||||||||||||||||||||
2.2 | Formulation of Scheme for providing FTTH Connection with USOF Support | Scheme is under formulation. The Cabinet Note for villages connectivity would also include proposal for FTTH connections. | ||||||||||||||||||||||||||||||||||||
3. | Scheme for hiring of 20 Gbps International Bandwidth at Agartala through Cox Bazar | Monitoring of the Scheme and release of payment | ||||||||||||||||||||||||||||||||||||
4 | Provision of 4G based mobile services in identified uncovered villages & along National Highways in MEGHALAYA Revised Scope :Total Sites – 1094; Total Villages – 1481 | |||||||||||||||||||||||||||||||||||||
4.1 | Village survey | 1164 (Done) | NIL (Done) | 250 | 650 | Remarks: Total 323 sites and 406 villages are deleted from the project. Rollout – 18 months i.e. upto 03.03.2022. Extended by 6 months i.e. upto 03.09.2022 for 383 sites (379 village sites and 4 NH sites). Extended by 6 months i.e. upto 03.03.2023 for 63 sites. As per revised scope, LoI issued to M/s BHL on 16.09.2022 for inclusion of 528 sites covering 723 villages. Acceptance yet to be received. Rollout – 12 months i.e. upto 03.09.2023.0 | ||||||||||||||||||||||||||||||||
4.2 | Sites Commissioning | 278 (Done) | 311 (Done) | 330 | 370 | |||||||||||||||||||||||||||||||||
5 | Provision of 4G based mobile services in identified uncovered villages in ARUNACHAL PRADESH Revised Scope : Total Sites – 980 ; Total Villages – 1683 | |||||||||||||||||||||||||||||||||||||
5.1 | Village survey | 1683 (Done) | NIL | NIL | NIL | Rollout – 18 months from signing of agreement i.e. upto April, 2023 (28.04.2023). | ||||||||||||||||||||||||||||||||
5.2 | Sites Commissioning | NIL | 6 (Done) | 110 | 180 | |||||||||||||||||||||||||||||||||
6 | Provision of 4G based mobile services in identified uncovered villages in TWO DISTRICTS OF ASSAM (KARBI ANGLONG & DIMA HASAO) Revised Scope :Total Sites – 531 ; Total Villages – 691 | |||||||||||||||||||||||||||||||||||||
6.1 | Village survey | 537 (Done) | 653 (Done) | 691 | NIL | Rollout - 18 months from signing of agreement i.e. upto April, 2023 (30.04.2023). | ||||||||||||||||||||||||||||||||
6.2 | Sites Commissioning | 17 (Done) | 50 (Done) | 110 | 180 | |||||||||||||||||||||||||||||||||
7 | BSNL revival plan (MoU target points): | |||||||||||||||||||||||||||||||||||||
7.1 | BSNL shall contribute towards the goal of providing broadband services to rural households with its extensive market presence across India, leading to faster universal broadband/internet access. | BSNL has on-boarded 1302 channel partners (BharatNet Udyami). 633 new mini OLTE deployed by these channel partners and 11,271 FTTH provided using BharatNet + BSNL network as on 18.10.2022 (Since 1st April, 2022). Data usage = 45.1 GB per connection/month | ||||||||||||||||||||||||||||||||||||
7.2 | BSNL will be fully responsible for meeting targets set by Government for roll out of FTTX services in all villages through the Internet Service Providers (ISPs), Virtual Network Operators (VNOs), BSNL Channel Partners, State SPVs under BharatNetand USOF funded last mile infrastructure like mini OLT/customer ONT etc to deliver the service with upgraded network. | 1. Presently, a pilot is approved to provide 1 lakh FTTH connections in six months by BSNL. 2. Connection with State SPVs and targets also given for utilization to be monitored by BSNL/BharatNet vertical in BSNL. | ||||||||||||||||||||||||||||||||||||
7.3 |
BSNL shall achieve the following interim outcome targets for utilization of BharatNet assets;
(Cumulative by end of each quarter)
|
|||||||||||||||||||||||||||||||||||||
7.3.1 | FTTH (BSNL) (cumulative) | |||||||||||||||||||||||||||||||||||||
7.3.2 | Dark Fibre(BSNL) (cumulative) | |||||||||||||||||||||||||||||||||||||
7.3.3 | Mobile Tower Fiberisation (BSNL) (cumulative) | |||||||||||||||||||||||||||||||||||||
7.4 | The current customer base over Bharatnet shall be increased to 5 times in next 5 years and the data utilization shall be increased from current level to 10 times. |
Director (BB-I), USOF under DDG(I)
Work Plan for 2022-23
Sr. | Scheme/Project | Target | Remarks | ||||
---|---|---|---|---|---|---|---|
Q1 | Q2 | Q3 | Q4 | ||||
1 |
Provision of 4G based mobile services in identified uncovered villages & along National Highways in MEGHALAYA Revised Scope : Total Sites – 1094 Total Villages – 1481 |
Village survey |
1164 (Done) |
NIL (Done) |
250 |
650 |
Total 323 sites and 406 villages are deleted from the project. Rollout – 18 months i.e. upto 03.03.2022. Extended by 6 months i.e. upto 03.09.2022 for 383 sites (379 village sites and 4 NH sites). Extended by 6 months i.e. upto 03.03.2023 for 63 sites. As per revised scope, LoI issued to M/s BHL on 16.09.2022 for inclusion of 528 sites covering 723 villages. Acceptance yet to be received. Rollout – 12 months i.e. upto 03.09.2023. |
Sr. | Scheme/Project | Target | Remarks | ||||
---|---|---|---|---|---|---|---|
Q1 | Q2 | Q3 | Q4 | ||||
2. |
Provision of 4G based mobile services in identified uncovered villages in ARUNACHAL PRADESH Revised Scope : Total Sites – 980 Total Villages – 1683 |
Village survey |
1683 ( (Done) |
NIL |
NIL |
NIL |
Rollout – 18 months from signing of agreement i.e. upto April, 2023 (28.04.2023). |
Sites commissioning |
Nil |
6 (Done) |
90 |
220 |
Sr. | Scheme/Project | Target | Remarks | ||||
---|---|---|---|---|---|---|---|
Q1 | Q2 | Q3 | Q4 | ||||
3. |
Provision of 4G based mobile services in identified uncovered villages in TWO DISTRICTS OF ASSAM (KARBI ANGLONG & DIMA HASAO) Revised Scope : Total Sites – 531 Total Villages – 691 |
Village survey |
537 (Done) |
653 (Done) |
691 |
NIL |
Rollout - 18 months from signing of agreement i.e. upto April, 2023 (30.04.2023). |
Sites Commissioning |
17 (Done) |
50 (Done) |
110 |
180 |
Director (BB-II) USOF under DDG(I)
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23
S. No. | Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 | Remarks | |||
---|---|---|---|---|---|---|---|---|---|
1. |
Scheme for provisioning of mobile services in uncovered villages of Rest of NER |
||||||||
1.1 |
Progress of verification of sites by testing agency (cumulative) |
130 (10%) |
325 (25%) |
650 (50%) |
975 (75%) |
As on 15.10.2022, 590 sites have been verified. However, verification report is yet to be submitted by testing agency. |
|||
1.2 |
Quarterly verification of downtime of the commissioned sites through LSAs |
Ongoing activity |
Around 70 % verification of 21-22 is finished. Balanced work is under progress. |
||||||
2.1 |
Rollout of 1 lakh FTTH connections under pilot through BSNL |
Scheme approved |
40,000 FTTH connections |
60,000 FTTH connections |
|||||
2.2 |
Formulation of Scheme for providing FTTH Connection with USOF Support |
Scheme is under formulation. The Cabinet Note for villages connectivity would also include proposal for FTTH connections. |
|||||||
3. |
Scheme for hiring of 20 Gbps International Bandwidth at Agartala through Cox Bazar |
Monitoring of the Scheme and release of payment |
|||||||
S. No. |
Goals |
Target Q1 |
Target Q2 |
Target Q3 |
Target Q4 |
Remarks |
|||
4. |
Note: Scheme for Last Mile Connectivity (LMC) is under formulation. The Cabinet Note for villages connectivity would also include proposal for FTTH connections. |
||||||||
BSNL shall achieve the following interim outcome targets for utilization of BharatNet Assets: (cumulative by end of each Quarter) |
Sanjay Varshney, DDG(II) USOF
TARGETS AND GOALS SETTING FOR THE FY YEAR 2022-23
Sl. No. | Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 |
---|---|---|---|---|---|
1 |
Provision of submarine Optical Fibre Connectivity between Kochi and Lakshadweep islands (KLI Project) |
Approval of EIA/CRZ, Wildlife clearance etc. report by MoEF&CC |
Equipment/Submarine Plant Manufacturing & Factory Acceptance Testing(FAT) |
Cable loading and Equipment Transport. |
-Submarine Cable laying and Testing. -Land Cable Installation -Equipment Installation |
2 |
Provision of 4G mobile Services in 85 Uncovered villages and seamless mobile coverage along NH-4 in Andaman & Nicobar Islands. |
No. of Tower Sites to be installed : 0 |
No. of Tower Sites to be installed : 0 |
No. of Tower Sites to be installed : 0 |
No. of Tower Sites to be installed : 15 |
3 |
Upgradation of existing 19 Tower Sites for 2G mobile Services and installation of additional 18 New Mobile Tower Sites for provision of 4G mobile Services and creation of OFC Network for provision of FTTH in Lakshadweep islands by BSNL. |
Proposal finalised |
Proposal Approved, Work order placed to BSNL |
Tender done by BSNL for various works |
NIL (2G to 4G) NIL (4G New) NIL (OFC) |
4 |
Upgradation of existing 60 Tower Sites for 2G Mobile Services for provision of 4G Mobile Services in Andaman & Nicobar Islands by BSNL |
--- |
--- |
--- |
--- |
5 |
Deployment of Pilot Projects |
Approval by competent authority |
Rapid PoC |
Full deployment and certification testing |
Full deployment and certification testing |
6 |
Provision of Redundancy for Submarine Optical Fibre Connectivity for Andaman & Nicobar Islands by connecting Port Blair to Kolkata (Digha Beach) (CANI Project) |
Submission of DPR by TCIL Examination of DPR by USOF/DoT |
Approval and examination of DPR by competent authority |
Consultations with stakeholders and preparation of final proposal |
DCC and Cabinet Approval |
7 |
Provision of Submarine Optical Fibre Connectivity for Diglipur, Shaheed Dweep (Erstwhile Neil Island), Katchall, Teressa, Chowra, Nancowary and Little Nicobar Island under CANI Project as per request of Andaman & Nicobar UT Administration on turnkey basis to Indian Company to promote Atmanirbhar Bharat. |
Submission of DPR by TCIL Examination of DPR by USOF/DoT |
Approval and examination of DPR by competent authority |
Consultations with stakeholders and preparation of final proposal |
DCC and Cabinet Approval |
8 |
Provision of Last Mile connectivity at 5521 Satellite VSAT locations for installation of 9633 Wi-Fi Access Points |
Finalization tender and award of work by BBNL |
Tender failed |
Re-floating of tender |
No. of Wi-Fi APs to be provided: 100 |
9 |
Provision of Satellite VSAT Broadband Connectivity to balance GPs out of 4112 sites by BBNL under BharatNet (plus remaining GPs, if any, by BSNL/ BBNL) |
|
- |
Complete installation by Dec 2022 |
|
10 |
O&M of Satellite VSAT GPs/ DSPTs/ WiFi APs provided under BharatNet by BBNL/ BSNL as per SLA signed |
Continuous Monitoring |
|||
11 |
Redistribution of existing Satellite Bandwidth in Andaman & Nicobar Islands by BSNL for the Islands not connected on Submarine OFC as per request of ANI UT Administration |
Examination of DPR submitted by BSNL for vetting of Technical requirements and detailed cost estimates |
DPR examination by committee and clarifications from BSNL, UT ANI and MHA |
Award of work |
Completion |
12 |
Singapore cable & CLS |
Survey report |
DCC approval |
Cabinet approval |
Tender |
13 |
Lakshadweep Satellite Bandwidth |
No expansion required by UT LKD |
--- |
--- |
--- |
14 |
Telecom Technology Development Fund (TTDF) |
Preparation of Guidelines |
-Approval of DCC and Hon’ble MoC. -Launch of Scheme |
Receipt and Evaluation of proposals |
Approval and start of R&D projects |
15 |
Thai Com Satellite bandwidth |
Submission of proposal for approval |
--- |
--- |
Approval for migration of Thaicomm satellite VSATs on ISAT |
16 |
New Technologies for BharatNet |
|
|
Identification of new technologies for extending BharatNet |
Selection of suitable technologies |
17 |
Handing over of DSPTs to agencies of MHA/MoD |
|
|
Approval process |
Completion of the work |
Deepak Chanduka, DDG (Special Projects), USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23
Sl. No. | Name of Project | No. of Villages/ Locations as per Agreement | Scope after Survey | No. of Villages/ Locations already covered | Balance Villages/ Locations to be covered | Quarter-3 Targets | Quarter-4 Targets | Remarks | |
---|---|---|---|---|---|---|---|---|---|
1 | 354 Uncovered Villages Project | 409 | 343 | 290 | 53 | 12 | 33 sites Proposed for deletion | ||
3 | 502 Uncovered Villages in Aspirational Districts Project | 529 | 276 | 122 | 154 | 33 | 21 | 75 Sites Forest Permission, 8 Non-feasible, 13 Land Ownership Issue | |
4 | LWE Phase-I Sites - 2G to 4G Upgradation Project | 2,343 | 2,343 | - | 2,343 | 100 | 500 | ||
5 | LWE Phase-II Project | 2,542 | 1,352 | 191 | 1,161 | 379 | 776 | ||
6 | BOPs/ BIPs Coverage Project | 1,117 | 1,117 | - | 1,117 | - | 100 | Project under approval | |
7 | CSC Bihar Pilot Project - Signing of Agreement | -- | - | - | Agreement already Approved | ||||
10 | 7287 Aspirational Districts | 7,287 | 5901 Villages/3864 Sites | - | 3,864 | 200 | 400 | Survey is in progress,5637 Villages surveyed so far. | |
11 | 4G Saturation | 24,680 | 17196 villages/12835 Sites | - | 12,835 | 500 | 2,500 | ||
2G/ 3G Upgradation | 6,279 | 4333 Villages/2812 Sites | 2,812 | 500 | 1,000 | ||||
12 | 10 Worst Districts (Utkarsh) - NITI Aayog Scheme | 3,287 | 3,287 | 575 | 2,712 | 90 | 150 | The base figure reported to NITI Aayog/MoRD is 3287 as on 31.03.2022.As per report received from DGT 430 new uncovered villages have been identified after 31.03.2022 so now total uncovered as on 30.09.2022 is 3142 (2712+430). Nodal DDG of LSA are monitoring the progress and updating the status of covered villages in the 10 districts on quarterly basis. | |
Total | 48,473 | 8,718 | 1,178 | 27,051 | 1,814 | 5,447 | |||
13 | BSNL revival plan (MoU target points): | ||||||||
13.1 | USOF shall work out detailed timelines and targets for rollout fiber in all villages in merged BSNL and put in an appropriate monitoring mechanism to ensure high quality of service | Finalization of revised Strategy | Tendering for revised model of BharatNet | ||||||
13.2 | BSNL shall assist GOI in meeting the targets of digital connectivity to provide universal internet service through wired and wireless media. BSNL shall undertake expansion of telecom services including for providing mobile telecom services in uncovered areas and laying the fiber network throughout the country under BharatNet for providing broadband connectivity. | The Union Cabinet on 27.07.2022 approved a project for saturation of 4G mobile services in uncovered villages across country at total cost of Rs 26,316 Cr, to provide 4G mobile in 24,680 uncovered villages. The work has been awarded to BSNL and being closely monitored. |
Sita Ram Meena, Director (T-II), USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23
Sl. No. | Goals | Status Q1 | Status Q2 | Target Q3 | Target Q4 |
---|---|---|---|---|---|
1. | Provision of Mobile Services in 354 uncovered villages of Ladakh, J&K, border and other priority areas | Provision of mobile services in 268/ 334 Villages | Provision of mobile services in 290/ 334 Villages | Provision of mobile services in 334/ 334 Villages | -- |
2. | Provision of mobile services in 502 uncovered villages /462 towers in Aspirational Districts in Bihar, Madhya Pradesh, Rajasthan and Uttar Pradesh | Provision of mobile services in 86/ 276 Villages | Provision of mobile services in 122/ 276 Villages | Provision of mobile services in 200/ 276 Villages | Provision of mobile services in 276/ 276 Villages |
3 | Provision of Mobile Services under Left Wing Extremism (LWE) Phase-II Project – 2,542 Locations | Survey for 90% locations and provision of mobile services at 37/ 1,113 locations | Provision of mobile services at 191/ 1,113 locations | Provision of mobile services at 500/ 1,113 locations | Provision of mobile services at 1,113/ 1,113 locations |
4 | Upgradation of 2G Mobile Services commissioned under Left Wing Extremism (LWE) Phase-I Project to 4G | Cabinet Approval | BSNL to float tender for infrastructure and equipment and award the work | Finalization of Tender by BSNL | Upgradation of infrastructure for remaining sites and installation of 4G equipment for 1,000 sites. |
5. | Provision of 4G mobile services at BOPs/ BIPs – 1,117 locations of BGFs/ IB | Submission of DPR by BSNL | Digital Communications Commission (DCC) Approval | Cabinet Approval | Survey for 25% locations by BSNL |
6. | Signing of Agreement with CSC for Pilot Project in Bihar | -- | Agreement approval by competent authority, circulation to CSC for signing | CSC yet to accept the approved agreement | -- |
B. P. Vishwakarma, Director (T-III), USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23
Sl. No. | Goals | Status Q1 | Status Q2 | Target Q3 | Target Q4 |
---|---|---|---|---|---|
1. | Provision of mobile services in 7287 villages in Aspirational Districts in five states (AP, JKD, CHGD, MH, OD) – 4,779 Towers to be installed | -- | 5,637 Villages Surveyed | Survey of 6,500 Villages Provision of mobile services in 100 villages | Survey of remaining Villages. Provision of mobile services in 300 villages |
2. | 4G Saturation Project for coverage of 30,959 remaining Uncovered Villages across country | DCC Approval | Cabinet Approval, 30,380 Villages Surveyed. | Survey of remaining Villages. Provision of mobile services in 500 villages | Provision of mobile services in 2,500 villages |
3. | 10 Low performing Districts (Mission Utkarsh) – NITI Aayog Aspirational Districts Project – 3,142 Uncovered Villages | -- | 575 out of 3,287 Villages covered. Further 430 Villages identified | 665 Villages to be covered | 815 Villages to be covered |
Joint Administrator (Finance) and DDG (PM), USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23
Sl. No. | Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 | ||
---|---|---|---|---|---|---|---|
1 |
Revamping the USOF website |
Onboarding of Agency |
Development Phase |
Testing and Roll-out of revamped website. Development of R&D portal. Security Audit |
Improvising content, maintenance and upgradation as per needs. Administration of website. |
||
2 |
Development of Online payment tracking and management system |
Onboarding of Agency |
As-is assessment |
Development, Testing and Roll-out |
Training to CCAs/LSA /USP |
||
3 |
Strategy for Communication and Media Outreach |
Onboarding of Agency |
As-is assessment Preparation of Strategy document. |
IEC and Regular Social Media and Communication outreach PMU Communication strategy and implement activities such as coffee book table, stakeholders meet, survey of ISPs, national and global conferences, white papers, etc. |
|||
4. |
PMU- Development of Internal dashboard and MIS |
Onboarding of Agency |
As-is assessment |
Development of State-wise combined report (Bharatnet and Other Schemes) including all social media activities, photos, videos, project launch details, official visit reports, documentation of Project wise achievements (MIS) |
Monthly updation of State-wise combined report (Bharatnet and Other Schemes) including all social media activities, photos, videos, project launch details, official visit reports, documentation of Project wise achievements (MIS) |
||
5 |
Monitoring of PMU |
Onboarding of Agency |
Fortnightly review with Administrator Weekly review with JAF Coordination with all Nodal wings |
Monthly review with Administrator Weekly review with JAF Coordination with all Nodal wings |
Monthly review with Administrator Weekly review with JAF Coordination with all Nodal wings |
||
6 |
Development of Strategy for LMC, USOF 2.0 |
Onboarding of Agency |
As-is assessment |
Stakeholder consultation, Preparation of Strategy papers, holding of Conference |
|||
7 |
Bharatnet O&M of Phase-1 |
- |
Finalization of O&M agreement with BSNL Settlement of Mob. Advances and other payments. |
Payment and Settlement of Quarterly subsidies. Coordination with CCAs |
|||
8 |
Settlement of CSC issues with respect to O&M, FLM and LMC agreement Bihar Project |
1. Finalization of payment proforma for settlement of LMC claims under tripartite Agreement dated 15-07-2019 2. Provision of inputs for settlement of advances for O&M activities by BBNL 3. Finalization of TPA for LMC work under tripartite Agreement dated 15-07-2019 4. Preparation of Bihar Agreement |
1. Based on inputs from TPA, payment processing for LMC will be put up for approval of competent authority. 2. Approved Bihar Agreement to be signed by CSC-SPV 3. Providing inputs to BBNL for financial closure of O&M Agreement. |
||||
9 |
Providing necessary support required under upcoming BharatNet Phase-III for village connectivity |
Designing of the scheme, subsidy modelling, cost committee, policy and financial inputs |
Approval of Scheme, Preparation of DCC/Cabinet note, IMC, Framing of RFP document, coordination with BSNL, Financial and subsidy disbursement activities Financial progress monitoring and Implementation |
||||
10 |
Special Assistance to States for LMC |
- |
Financial examination of State’s proposal on LMC |
||||
11 |
Formalization of Budget Announcement in respect of 5% R&D fund |
Finalization of guidelines |
Creation of new Head of Account and Fund requisition |
Subsidy disbursal activities |
|||
12 |
Finance advice on proposals received through Nodal wing in respect of Bharatnet |
Financial examination of proposals received and providing inputs on subsidy, payment modalities etc. |
Signing of MoU / amendment in existing MoU, Implementation, Subsidy settlements and Monitoring |
||||
13 |
Finance advice on proposals received through Nodal wing in respect of Mobile schemes |
Financial examination of proposals received and providing inputs on subsidy, payment modalities etc. |
Signing of MoU / amendment in existing MoU, Implementation, Subsidy settlements and Monitoring |
||||
14 |
Booking of Expenditure under BharatNet |
982.4 |
3017.6 |
||||
15 16 |
Booking of Expenditure under USOF Schemes |
Project | Expenditure upto Q2 (in Rs Cr.) | Targeted Expenditure in Q3 (in Rs. Cr.) | Targeted Expenditure in Q4 (in Rs. Cr.) | ||
4G Mobile Services in Meghalaya |
69.98 |
50 |
50 |
||||
4G Mobile Services in AP& 2 dists. of Assam |
Nil |
150 |
150 |
||||
LWE Phase - I (Upgradation & O&M) |
Nil |
250 |
300 |
||||
Submarine OFC KLI |
1.49 |
120 |
150 |
||||
4G mobile services in 502 UC Villages |
15.65 |
34 |
53 |
||||
Mobile Services in 7287 UC villages |
Nil |
Nil |
Nil |
||||
Mobile Services in 354 UC villages |
38.71 |
5 |
10 |
||||
Mobile services in LWE Ph-II |
Nil |
100 |
190 |
||||
4G Saturation by BSNL |
Nil |
Nil |
Nil |
||||
Other Projects |
59.69 |
103 |
100 |
||||
Scrutiny and Monitoring of Claim Settlement and Management System (CSMS) works |
Quarterly: Scrutiny, Approval and Monitoring of OSR-1, 2 and 3 subsidy claim receipts from CCA offices. |
||||||
17 |
Financial Closure of Schemes |
Old schemes closure like WL BB scheme. (Reports already sought from all circles) |
Satellite bandwidth upgradation from 318 to 1.71 Gbps LKD Satellite bandwidth upgradation from 1 to 2 Gbps for ANI |
25000 WiFi Hotspots at RTE by BSNL 200 WiFi Hotspots at Rural Railway Stations by RailTel |
|||
18 |
Physical verification reports for projects |
Ongoing review |
Ongoing review |
Ongoing review |
Ongoing review |
||
19 |
Updation of PRAYAS dashboard |
Regular updates |
Regular updates |
Regular updates |
Regular updates |
||
General Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 | |||
21 |
Budget and Parliamentary Committee related matters |
1. Preparation of Revised Estimates and Budget Estimates. 2. Allocation/utilization of Budget and monitoring of expenditure made from USOF and UAL collection. 3. Preparing Financial statements for onward submission to various Parliamentary Committees, Ministries like NITI, MoTA etc. 4. Verification of Villages list submitted by MoTA for mobile coverage. 5. Preparation of List of Points and Background Note for Standing Committee for “Review of USOF Project especially LWE and NER” |
|||||
21 |
Compliances in respect of NIP, OOMF, Budget Announcement, 10% GBS, Tribal Sub Plan, SC Sub Plan, CAPEX information to MoF |
Providing financial information to concerned agency on regular basis as per requirement. |
|||||
22 |
Finance Member in Committees |
Cost Committee 5% R&D guidelines Standing Committee- CSC Six Fibre Centage Committee Amarnath Yatra |
5% R&D guidelines Pilot LMC Special Assistance to States for LMC CANI redundancy |
Framing of Rules under the new Telecom Bill BAL project-NER Special Assistance to States for LMC |
|||
23 |
Delegation of financial powers of Administrator, USOF |
Submission to competent authority for approval |
|||||
24 |
Finance advice on proposal received through Nodal wing for issuance of EOI for engagement of TPA |
- |
To propose an independent TPA structure |
Floating of an independent TPA tender |
Integrating TPA reports with the PM Tool and linking to EQS subsidy disbursement. |
||
25 |
Timely Disposal of Internal Audit/CAG Paras/Performance Audit |
Regular and ongoing activity |
Regular and ongoing activity |
Regular and ongoing activity |
Regular and ongoing activity |
||
26 |
Documentation of project wise work |
||||||
27 |
State wise USOF monthly reports |
||||||
28 |
Revision of PMU team work |
||||||
26 |
BSNL revival plan (MoU target points): | ||||||
26.1 |
BSNL shall undertake required clearance for merger of BBNL in a time-bound manner and shall endeavour to complete the merger in a time-bound manner preferably within 6 months for success of BharatNet. A transaction advisor shall be appointed by BSNL for completing the merger in a time-bound manner. |
Inputs for Cabinet Note, Implementation of Phase I, II O&M through BSNL |
Finalization of interim measures pending merger. Pilot Project |
Pilot Project implementation, Agreement with BSNL Finalization of interim measures pending merger. Asset Management |
Giving inputs for funding modalities and oversee financial handover based on Transaction Adviser recommendations, Asset Management |
||
26.2 |
Merger of BBNL with BSNL shall be a cash neutral transaction, with a larger objective of better utilization of existing assets. BBNL and BSNL merger shall create synergy between two organizations so that Bharatnet infrastructure can be better managed with higher Uptime and it can be leveraged for enhanced utilization of data by more customers. |
M/s Deollite appointed as Transaction Advisor by BSNL. In the meeting by Secretary(T) on 27.10.2022, BSNL has been directed to submit a comprehensive plan for merger of BBNL with BSNL by 15th Nov, 2022. |
Deputy Administrator(Finance-I) USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23.
Sl. No. | Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 | ||
---|---|---|---|---|---|---|---|
1 |
Finance advice on proposals received through Nodal wing in respect of Mobile schemes |
From time to time |
From time to time |
||||
2 |
Booking of Expenditure under USOF Schemes |
Targeted Expenditure in Q1 (In Rs Cr.) | Targeted Expenditure in Q2 (in Rs Cr.) | Targeted Expenditure in Q3 (in Rs. Cr.) | Targeted Expenditure in Q4 (in Rs. Cr.) | ||
4G Mobile Services in Meghalaya |
15.83 |
54.15 |
50 |
50 |
|||
4G Mobile Services in AP& 2 dists. of Assam |
Nil |
Nil |
150 |
150 |
|||
LWE Phase - I (Upgradation & O&M) |
Nil |
Nil |
250 |
300 |
|||
Submarine OFC KLI |
0.05 |
1.44 |
120 |
150 |
|||
4G mobile services in 502 UC Villages |
2.83 |
12.82 |
34 |
53 |
|||
Mobile Services in 7287 UC villages |
Nil |
Nil |
Nil |
Nil |
|||
Mobile Services in 354 UC villages |
10.68 |
28.03 |
5 |
10 |
|||
Mobile services in LWE Ph-II |
Nil |
Nil |
100 |
190 |
|||
4G Saturation by BSNL |
Nil |
Nil |
Nil |
Nil |
|||
Other Projects |
17.04 |
42.65 |
103 |
100 |
|||
3 |
Scrutiny and Monitoring of Claim Settlement and Management System (CSMS) works |
Quarterly: Scrutiny, Approval and Monitoring of OSR-1, 2 and 3 subsidy claim receipts from CCA offices. No pendency beyond 12 working hours after receipt of OSR. |
|||||
4 |
Financial Closure of Schemes |
Satellite bandwidth upgradation from 318 to 1.71 Gbps LKD Satellite bandwidth upgradation from 1 to 2 Gbps for ANI |
25000 WiFi Hotspots at RTE by BSNL 200 WiFi Hotspots at Rural Railway Stations by RailTel |
||||
General Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 | |||
5 |
Delegation of financial powers of Administrator, USOF |
NA |
NA |
Submission to competent authority for approval |
Booking of expenses as per delegation of financial powers |
||
6 |
Finance advice on proposal received through Nodal wing for issuance of EOI for engagement of TPA |
NA |
To propose an independent TPA structure |
Floating of an independent TPA tender |
Integrating TPA reports with the PM Tool and linking to EQS subsidy disbursement. |
||
7 |
Settlement of TCIL pending bills for old consultation /DPR |
NA |
NA |
Received from TCIL. Forwarded to all concerned. Rigorous follow ups |
Closure of all pending payments and closure of accounts |
||
8 |
Disposal of Bills (Remuneration/ BECIL/ CSMS Vendor/TCIL) |
Within 7 days of receipt |
Within 7 days of receipt |
Within 7 days of receipt |
Within 7 days of receipt |
||
9 |
Finalization of BharatNet Phase III |
Committee constituted Finalization of Report (DAF I Member) |
Thorough Examination and Scrutiny of realistic cost estimates and seeking approval through EFC Memo |
||||
10 |
Creation of New Activity for new scheme/ approvals |
Cabinet Approval |
Issue of PO to BSNL for LWE Phase I |
Creation of OSR Activity Settlement of Claims |
Closure of all pending claims |
||
11 |
Timely Disposal of CAG Para |
Receipt of Audit remarks |
Modified reply to audit after inputs from BSNL/ Nodal wing |
||||
Deputy Administrator(Finance-II) USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23
Sl. No. | Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 | |
---|---|---|---|---|---|---|
1 |
Revamping the USOF website |
Onboarding of Agency |
Development Phase |
Testing and Roll-out of revamped website. Development of R&D portal. Security Audit |
Improvising content, maintenance and upgradation as per needs. Administration of website. |
|
2 |
Development of Online payment tracking and management system |
Onboarding of Agency |
As-is assessment |
Development, Testing and Roll-out |
Training to CCAs/LSA /USP |
|
3 |
Strategy for Communication and Media Outreach |
Onboarding of Agency |
As-is assessment Preparation of Strategy document. |
IEC and Regular Social Media and Communication outreach PMU Communication strategy and implement activities such as coffee book table, stakeholders meet, survey of ISPs, national and global conferences, white papers, etc. |
||
4. |
PMU- Development of Internal dashboard and MIS |
Onboarding of Agency |
As-is assessment |
Development of State-wise combined report (Bharatnet and Other Schemes) including all social media activities, photos, videos, project launch details, official visit reports, documentation of Project wise achievements (MIS) |
Monthly updation of State-wise combined report (Bharatnet and Other Schemes) including all social media activities, photos, videos, project launch details, official visit reports, documentation of Project wise achievements (MIS) |
|
Sl No | Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 | |
5 |
Monitoring of PMU |
Onboarding of Agency |
Fortnightly review with Administrator Weekly review with JAF Coordination with all Nodal wings |
Monthly review with Administrator Weekly review with JAF Coordination with all Nodal wings |
Monthly review with Administrator Weekly review with JAF Coordination with all Nodal wings |
|
6 |
Development of Strategy for LMC, USOF 2.0 |
Onboarding of Agency |
As-is assessment |
Stakeholder consultation, Preparation of Strategy papers, holding of Conference |
||
7 |
Merger of BBNL and BSNL a) associated activities, b) funding modalities c) Utilization through Pilot Projects d) Creation of a separate Vertical of Bharatnet in BSNL |
Inputs for Cabinet Note, Implementation of Phase I, II O&M through BSNL |
Finalization of interim measures pending merger. Pilot Project |
Pilot Project implementation, Agreement with BSNL Finalization of interim measures pending merger. Asset Management |
Giving inputs for funding modalities and oversee financial handover based on Transaction Adviser recommendations, Asset Management |
|
8 |
Bharatnet O&M of Phase-1 |
- |
Finalization of O&M agreement with BSNL Settlement of Mob. Advances and other payments. |
Payment and Settlement of Quarterly subsidies. Coordination with CCAs |
||
9 |
Providing necessary support required under upcoming BharatNet Phase-III for village connectivity |
Designing of the scheme, subsidy modelling, cost committee, policy and financial inputs |
Approval of Scheme, Preparation of DCC/Cabinet note, IMC, Framing of RFP document, coordination with BSNL, Financial and subsidy disbursement activities Financial progress monitoring and Implementation |
|||
10 |
Formalization of Budget Announcement in respect of 5% R&D fund |
Finalization of guidelines |
Creation of new Head of Account and Fund requisition |
Subsidy disbursal activities |
||
11 |
Special Assistance to States for LMC |
- |
Financial examination of State’s proposal on LMC |
|||
12 |
Financial scrutiny of various proposals submitted by various nodal wings under State Led Model of BharatNet phase II. This may include providing LMC at GP level, Extending BharatNet connectivity upto Village level and examination of any other proposal which requires subsidy support from USOF. |
Financial examination of State’s proposal on LMC and providing inputs on subsidy benchmarking, payment modalities etc. |
Signing of MoU / amendment in existing MoU, Implementation, Subsidy settlements and Monitoring |
|||
13 |
Scrutiny and Monitoring of Claim Settlement and Management System (CSMS) works |
Quarterly: Scrutiny, Approval and Monitoring of OSR-1, 2 and 3 subsidy claim receipts from CCA offices. |
||||
14 |
Physical verification reports for projects |
Ongoing review |
Ongoing review |
Ongoing review |
Ongoing review |
|
15 |
Updation of PRAYAS dashboard |
Regular updates |
Regular updates |
Regular updates |
Regular updates |
DEPUTY ADMINISTRATOR (FINANCE-III), USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23
Sl No | Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 |
---|---|---|---|---|---|
7 |
Settlement of CSC issues with respect to O&M, FLM and LMC agreement Bihar Project |
1. Prepared proforma for settlement of LMC claims under tripartite Agreement dated 15-07-2019 2. For O&M activities, advances are being settled by BBNL 3. TPA to be finalized for LMC work under tripartite Agreement dated 15-07-2019 4. Preparation of Bihar Agreement |
1. Based on inputs from CSC-SPV, proforma will be put up for approval of competent authority. 2. Bihar Agreement approved by competent authority. However, CSC-SPV do not agree. Consensus to be built 3. Providing necessary assistance required to BBNL for financial closure of O&M Agreement. 4. To process payment for TPA. 5. TPA appointment for Bihar LMC project. |
||
11 |
Booking of Expenditure under BharatNet |
982.4 |
3017.6 |
||
12 |
Booking of Expenditure under USOF Schemes |
176.5 |
1223.5 |
||
General Goals | Target Q1 | Target Q2 | Target Q3 | Target Q4 | |
14 |
Budget and Parliamentary Committee related matters |
1. Preparation of Revised Estimates and Budget Estimates. 2. Allocation/utilization of Budget and monitoring of expenditure made from USOF and UAL collection. 3. Preparing Financial statements for onward submission to various Parliamentary Committees, Ministries like NITI, MoTA etc. 4.Preparation of Demands for Grants for FY 2023-24 in January 2023, (DFG will be examined by Standing Committee during which, Background Note, Oral Evidence to the Committee and Reply to the LOPs/Supplementary LOPs to be provided to the Committee.) 5. Parliamentary Standing Committee selected USOF Schemes for examination during the FY 2022-23 & 2023-24 6. Public Account Committee Selected Para No. 2.1 and 2.6.1 of CAG Report for examination. Action Taken Note on the said Paras and ATN on PAC Report to be provided in due course. 7. Action Taken Note on various Recommendations/ Observations of Parliamentary Committees is to be furnished. |
|||
15 |
Compliances |
NIP, OOMF, Budget Announcement, 10% GBS, Tribal Sub Plan, SC Sub Plan, CAPEX information to MoF, Preparation of EFC (if required) |
Providing financial information to concerned agency on regular basis as per requirement. To take up matter of EFC preparation with DoE. Providing replies for Internal Audit and Local Audit. |
Rajesh Gupta, JA(T&A), USOF
TARGETS AND GOALS SETTING FOR THE F.Y. YEAR 2022-23.
Sl. No. |
Goals |
Target /Status Q1 |
Target/Status Q2 |
Target Q3 |
Target Q4 |
||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. |
Completion of BharatNet Phase-I project (Railtel, PGCIL, BSNL) [As on 1.4.2022- 1,19,144/1,20,185 GPs] |
1,19,213/120185 GPs (+69 GPs) |
1,19,348/120185 (+135 GPs) |
360 GPs (BSNL- 266, PGCIL-59 RCIL-13 BBNL-22) |
375 (All BSNL- UKD-200, WB-50,+ UPE/Sikkim/other) |
||||||||||||||||||||||||||||
2. |
BharatNet Phase-II by BSNL (MP, UPE, UPW and Sikkim) [as on 1.4.2022 - 14091/24334 GPs] |
15,227/ 24334 (+1136) |
16429/24334 (+1202) |
22,000 GPs (MP-160 GPs and UPE- 6000 GPs) |
24000 GPs (UPW- 2000 and Sikkim- 114) |
||||||||||||||||||||||||||||
3. |
BharatNet under State-led model, 8 States 65,555 GPs (cumulative) |
31358 GPs (+2029GPs) |
32838 GPs (+1480 GPs) |
40,000 |
49,000 |
||||||||||||||||||||||||||||
4. |
O&M of BharatNet/ National level agency instead of CSC-SPV (cumulative) |
Tender & Work Award |
Tender and work award, Handing over from CSC, handover of spares, work orders and weekly targets followup ( Target- 55000 GPs operational) |
1,00,000 GPs operational |
1,20,000 GPs operational |
||||||||||||||||||||||||||||
5. |
Restructuring of USOF |
Proposal Approval |
Proposal to JST |
Follow-up |
Follow-up |
||||||||||||||||||||||||||||
6 |
Agreement to be signed between USOF and BSNL on constructions, O&M, utilization of the BharatNet network, payment terms and conditions etc. (Phase-I)
|
|
Agreement signing and release of advance - SIGNED |
Follow-up |
Follow-up |
||||||||||||||||||||||||||||
7 |
Quadripartite agreement between USOF, DoT, BSNL and BBNL on separate Bharatnet vertical |
|
Agreement preparation |
Agreement finalization and follow-up |
follow-up |
||||||||||||||||||||||||||||
8 |
Third Party verification of Last Mile connectivity provided by CSC SPV (77,115 Project) |
Work order release |
Physical verification completion |
Electronic verification |
Settlement |
||||||||||||||||||||||||||||
9 |
Hiring of staff through GEM |
|
Approval of requirement and RFP |
Finalisation of tender |
|
||||||||||||||||||||||||||||
10 |
Social Media Outreach |
|
Tweets-97, No. of followers-634, FB Popsts-38, No. of followers-38 |
Tweets-140, No. of followers-800, FB Popsts-80, No. of followers-200 |
Tweets-180, No. of followers-1000, FB Popsts-120, No. of followers-500 |
||||||||||||||||||||||||||||
11 |
Updating MIS for all USOF Division (a) e-Samiksha (b) Cabinet decisions (c) OOMF progress (d) Niti Aayog (e) VIP/PG cases etc |
Ongoing |
Ongoing |
Ongoing |
Ongoing |
||||||||||||||||||||||||||||
12 |
BSNL revival plan (MoU target points): |
||||||||||||||||||||||||||||||||
12.1 |
At present, BharatNet is only middle mile network. BSNL shall provide end-to-end connectivity. The operation, First Line Maintenance (FLM) and utilization of BharatNet (except State led model-phase-II) is with BSNL w.e.f. 01.04.2022 for better management and synergy. |
Issuing instructions and Finalisation of O&M tender by BSNL |
New Fiber Maintenance agencies onboarding |
Follow up for GPs availability to increase to 1 lakh |
Follow up to increase GPs availability to 1.25 lakh |
||||||||||||||||||||||||||||
12.2 |
Roles/responsibilities being discharged by BBNL shall be carried out by BSNL, with following guiding principles:
|
|
|
|
|
||||||||||||||||||||||||||||
12.2.1 |
a) BharatNet to be fully funded by USOF and infrastructure to be a National asset owned by USOF, accessible on a non-discriminatory basis to all Service Providers. Any discriminatory use of BharatNet shall attract penalties.
|
|
|
Key Guiding principle. Will be part of umbrella agreement with BSNL, which will be signed post merger of BBNL with BSNL. |
|
||||||||||||||||||||||||||||
12.2.2 |
b) BSNL to be responsible for targets by Government for BharatNet FTTX services in all villages including State SPVs.
|
|
Assigning targets/ workshop with State led States and review meetings |
State SPV targets Item 12.6 to be followed |
|
||||||||||||||||||||||||||||
12.2.3 |
c) Agreement to be signed between USOF and BSNL on constructions, O&M, utilization of the BharatNet network, payment terms and conditions etc. |
|
|
A quadripartite agreement between DoT, USOF, BSNL and BBNL is under finalization for separate BharatNet vertical in BSNL. Agreement for SLA based O&M of BharatNet Phase-I signed with BSNL on 29.08.2022. |
|
||||||||||||||||||||||||||||
12.2.4 |
d) Payment for O&M works to be based on outcome-linked measurable Service Level Agreements (SLAs) including penalties for non-performance. Payments for construction of the network to be based on the achievement of the milestones. |
|
|
SLA Based O&M of Phase-1 signed with BSNL on 29.08.2022, which include penalty conditions. |
|
||||||||||||||||||||||||||||
12.3 |
An umbrella MoU between USOF and BSNL will be signed for execution of Bharatnet/USOF projects by BSNL post merger and a separate vertical will be created in BSNL for Bharatnet/USOF projects. |
|
|
Draft preparation |
finlisation |
||||||||||||||||||||||||||||
12.4 |
Agreement signed between USOF and BSNL shall have outcome-linked measurable SLAs which shall be globally competitive (above 97%) and shall include penalties for non-performance. |
|
|
SLA Based O&M of Phase-1 signed with BSNL on 29.08.2022, which include penalty conditions. |
|
||||||||||||||||||||||||||||
12.5 |
Interim targets as under shall be implemented till a revised model is approved by the Government. 1. As on 01.08.2022, 1,78,174 GPs are service ready. 2.1 lakhs GPs shall be made serviceable by 31.12.2022. including GPs allocated to State SPVs, as per the table below: (Cumulative by end of each month)
* Phase-I and Phase-II(BSNL Model, BBNL Model and Satellite) ** Phase-II State led Model only - except Tamil Nadu |
||||||||||||||||||||||||||||||||
12.5.1 |
GPs with BSNL (including Phase-II) (BSNL MOU Target) (cumulative) |
|
41000 |
157000 |
|
||||||||||||||||||||||||||||
12.5.2 |
State SPV GPs (Phase-II) (cumulative) |
|
25000 |
53000 |
|
||||||||||||||||||||||||||||
12.6 |
BSNL shall achieve the following interim outcome targets for utilization of BharatNet assets; (Cumulative by end of each quarter)
|
||||||||||||||||||||||||||||||||
12.6.1 |
FTTH (State SPVs) (cumulative) |
|
|
500000 |
1000000 |
||||||||||||||||||||||||||||
12.6.2 |
Dark Fibre(State SPVs) (cumulative) |
|
|
15000 Km |
25000 Km |
||||||||||||||||||||||||||||
12.6.3 |
Mobile Tower Fiberisation (State SPVs) (cumulative) |
|
|
5000 |
5500 |
Sanjay Kumar, DA (T&A), USOF
TARGETS AND GOALS SETTING FOR THE FY YEAR 2022-23
Sl. No. |
Goals |
Target /Status Q1 |
Target/Status Q2 |
Target Q3 |
Target Q4 |
---|---|---|---|---|---|
1 |
Updating MIS for all USOF Division (a) e-Samiksha (b) Weekly Dashboard, Monthly Report, Monthly NITI Aayog Report, Monthly Report for Secretary, 61 actionable points report (c) Quarterly NITI Aayog Telecom Infrastructure Targets (d) Pending Cabinet decisions (e) OOMF progress (f) Data Governance Quality Index (DGQI) (g) Reply to PQs (h) Parliament Assurances (i) VIP/PG/CPGRAM cases & Nodal officer for USOF (j) State Wise Data of USOF Schemes (k) Matters related to trainings (l) Matters related to staff/officers (m) Matters related to RTI |
Ongoing |
Ongoing |
Ongoing |
Ongoing |
2. |
Restructuring of USOF |
Proposal Approval |
Proposal to JST |
Follow-up |
Follow-up |
3 |
Hiring of contractual staff through GEM |
|
Approval of requirement and RFP |
Finalisation of tender |
|
4 |
Social Media outreach |
Ongoing |
Tweets-97, No. of followers-634, FB Popsts-38, No. of followers-38 |
Tweets-140, No. of followers-800, FB Popsts-80, No. of followers-200 |
Tweets-180, No. of followers-1000, FB Popsts-120, No. of followers-500 |
5 |
BSNL revival plan follow-up |
Ongoing |
Ongoing |
Ongoing |
Ongoing |
6 |
Review of USOF Schemes by Secretary-T |
Ongoing |
Ongoing |
Ongoing |
Ongoing |
7 |
Record Retention Schedule of USOF |
|
|
Follow-up |
|
8 |
Meetings Co-ordination |
Ongoing |
Ongoing |
Ongoing |
Ongoing |
Ashi Kapoor, DA(T2), USOF
TARGETS AND GOALS SETTING FOR THE FY YEAR 2022-23
Sl. No. |
Goals |
Target /Status Q1 |
Target/Status Q2 |
Target Q3 |
Target Q4 |
---|---|---|---|---|---|
1. |
Completion of BharatNet Phase-I project (Railtel, PGCIL, BSNL) [As on 1.4.2022- 1,19,144/1,20,185 GPs] |
1,19,213/120185 GPs (+69 GPs) |
1,19,348/120185 (+135 GPs) |
360 GPs (BSNL- 266, PGCIL-59 RCIL-13 BBNL-22) |
375 (All BSNL- UKD-200, WB-50,+ UPE/Sikkim/other) |
2. |
BharatNet Phase-II by BSNL (MP, UPE, UPW and Sikkim) [as on 1.4.2022 - 14091/24334 GPs] |
15,227/ 24334 (+1136) |
16429/24334 (+1202) |
6866 GPs (MP-168 GPs and UPE- 6698 GPs) |
2241 (UPW- 2127 and Sikkim- 114) |
4. |
O&M of BharatNet/ National level agency instead of CSC-SPV |
Tender & Work Award |
Tender and work award, Handing over from CSC, handover of spares, work orders and weekly targets followup ( Target- 55000 GPs operational) |
1,00,000 GPs operational |
1,20,000 GPs operational |
6 |
Agreement to be signed between USOF and BSNL on constructions, O&M, utilization of the BharatNet network, payment terms and conditions etc. (Phase-I)
|
|
Agreement signing and release of advance - signed |
Follow-up |
Follow-up |
7 |
An umbrella MoU between USOF and BSNL will be signed for execution of Bharatnet/USOF projects by BSNL post merger and a separate vertical will be created in BSNL for Bharatnet/USOF projects. |
|
|
|
|
|
|
|
|
|
|
7.2 |
Umbrella MoU between USOF and BSNL post merger |
|
- |
Draft preparation |
finalisation |
8 |
As on 01.08.2022, 1,78,174 GPs are service ready. 2.1 lakhs GPs shall be made serviceable by 31.12.2022. including GPs allocated to State SPVs, as per the table below: |
|
|
|
|
8.1 |
GPs with BSNL (including Phase-II) |
|
41000 |
157000 |
|
10 |
Third Party verification of Last Mile connectivity provided by CSC SPV (77,115 Project) |
Work order release |
Physical verification completion |
Electronic verification |
Settlement |
Sheel P. Gautam, Dy Administrator (T-III), USOF
TARGETS AND GOALS SETTING FOR THE FY YEAR 2022-23
S.No. |
Goals |
Status Q1 |
Status Q2 |
Target Q3 |
Target Q4 |
---|---|---|---|---|---|
1. |
BharatNet Phase-II project in the eight States under the State-led model (Project execution for 65,555 GPs) (Cumulative) |
31394 |
32838 |
40000 |
49782 |
2. |
Availability of GPs (State-led) |
Less than 50% |
Less than 50% |
Above 90% |
Above 98% |
3. |
Utilization of BharatNet assets of State-led |
||||
3.1 |
FTTH connections (Quarter-wise) |
less than 10,000 |
17,218 |
5,00,000 |
10,00,000 |
3.2 |
Dark fibre leasing in Km (Cumulative) |
Less than 5000 |
6621 |
15000 Km |
25000 Km |
3.3 |
Tower fiberisation (Cumulative) |
Nil |
Nil |
5000 |
5500 |
4. |
Block FTTH saturation pilot project at Agiaon block, Bhojpur district in Bihar |
NA |
NA |
More than 1000 FTTH working connections |
Sustained more than 1000 FTTH working connections |